Rehabilitation of Rubaida Bridge

  •  A contract Between Aswar AL-Hadhaba Ltd. Company And DRC Organization
  • Rehabilitation of Rubaida Bridge
  • Project Value: 44,830,000 IQD
  • Project State: Finished
  • Project End estimation on: : 5-11-2018

Project Description:

Implementation dam to block the canal before and after the bridge and make side way bath with distant enough to pass the water of the canal with enough,remove the old bridge and excavation work of the canal. Use a water pump machine to pump the water out from the canal, Supply materials and lay a layer of gravel compact the ground under the bridge , and cast concrete, and paint the part of the bridge that contact with the ground with waterproofing materials. Refill the two approaches of the bridge and above it with good soil each layer not exceed 25 cm, install safety steel guardrail.